Projects

Gunung Megang-Meppo Gen Project

Satra participated in Meppogen 50 MW Combined Cycle Power Plant in Gunung Megang, Sumatra

Gunung Megang-Meppo Gen Project

Satra participated in Meppogen 50 MW Combined Cycle Power Plant in Gunung Megang, Sumatra

Project Location :

  • Gunung Megang, Muara Enim South Sumatera

Existing Facilites :

  • Existing Two (2) units LM 6000 PC Sprint CTG & BOP
  • PLN 150kVSwitchyard

Mayor Equipment 

  • Heat Recovery Steam Generator
  • Steam Turbin Generator
  • Cooling Water System
  • 150 kv Switchyard Extension
  • Balance Of Plant / Utilities
  • Water Treatement Plant and Water Intake
  • DCS Control System
  • MV/LV Switchgear and MCC
  • And other Facilities Including STG Building and Control Room


FRONT END BACKEND
Engineering Procurement & Logistics
Engineering, Procurement & Logistic Construction
Construction Individual Test
Individual Test Commissioning
Commisioning Handover

TIE-IN AND RELOCATION FUEL GAS LINE

HRSG UNIT 1 AND HRSG UNIT 2 (ERECTION WORK)


MECHANICAL DRAFT COOLING TOWER