Gunung Megang-Meppo Gen Project
Satra participated in Meppogen 50 MW Combined Cycle Power Plant in Gunung Megang, Sumatra
Project Location :
- Gunung Megang, Muara Enim South Sumatera
Existing Facilites :
- Existing Two (2) units LM 6000 PC Sprint CTG & BOP
- PLN 150kVSwitchyard
Mayor Equipment
- Heat Recovery Steam Generator
- Steam Turbin Generator
- Cooling Water System
- 150 kv Switchyard Extension
- Balance Of Plant / Utilities
- Water Treatement Plant and Water Intake
- DCS Control System
- MV/LV Switchgear and MCC
- And other Facilities Including STG Building and Control Room
| FRONT END | BACKEND |
| Engineering | Procurement & Logistics |
| Engineering, Procurement & Logistic | Construction |
| Construction | Individual Test |
| Individual Test | Commissioning |
| Commisioning | Handover |

TIE-IN AND RELOCATION FUEL GAS LINE

HRSG UNIT 1 AND HRSG UNIT 2 (ERECTION WORK)

MECHANICAL DRAFT COOLING TOWER